Buying Properties in Estonia: Renovation & Building‑Permit Roadmap
- John Philips

- Aug 9
- 2 min read
Updated: Nov 14

1 | Do You Even Need a Permit?
Project Type | Permit Required? | Fast‑Track “Notice” Option |
Interior layout change (non‑load‑bearing wall) | ❌ | ✔ – Works Notice (Ehitusteatis) |
New window/door opening | ✔ | ❌ |
Kitchen/bathroom replacement | ❌ | – |
Balcony glazing | ✔ | ❌ |
Solar‑panel roof array (< 15 kW) | ✔ (simplified) | – |
Detached garden shed ≤ 20 m² | ❌ | ✔ |
Rule of thumb: If you alter structure, façade, or utilities capacity—expect a Building Permit (Ehitusluba).
2 | Permit Types & Authorities
Permit | For Projects | Issued By | Statutory Time |
Ehitusteatis (Works Notice) | Minor non‑structural works | Municipal Building Dept. | 10 days |
Ehitusluba (Building Permit) | Structural or façade changes, > 60 m² additions | Same | 30 days (can extend to 60) |
Kasutusluba (Occupancy Cert.) | Post‑works sign‑off | Same | 10 days |
Submit digitally via the Ehitisregister portal with Smart‑ID / e‑Residency signature.
3 | Cost Breakdown (Typical Apartment Remodel)
Item | Cost (€) |
Architect drawings | 1 200 |
Structural engineer calc (if needed) | 600 |
Municipal permit fee | 100–250 |
Waste‑disposal permit | 40 |
As‑built survey (for occupancy cert.) | 150 |
Total Compliance Cost | ≈ 2 000 |
Budget 3 %–5 % of renovation budget for paperwork.
4 | Timeline From Idea to Handover
Day | Task |
0 | Hire architect; scope works. |
14 | Receive drawings & engineer note. |
15 | Submit permit package via Ehitisregister. |
45 | Permit granted (Ehitusluba). |
46 | Notify HOA & neighbours (7 days). |
53 | Start construction. |
120 | Works complete; book inspection. |
130 | Occupancy certificate issued—project closed. |
5 | Common Pitfalls & How to Avoid Them
Skipping asbestos survey in Soviet‑era flats—€3 000 fine.
Ignoring HOA bylaws—balcony glazing banned in some façades.
Under‑estimating structural impact—cutting a load‑bearing wall voids insurance.
Noise‑hour violations—work only 07:00 – 22:00; fines up to €400.
6 | Sustainable Retrofit Bonus
Projects that raise EPC to Class B or better qualify for:
KredEx grant 30 %–50 % of eligible costs.
Green‑loan rate cut 0.3 pp.
Include energy‑model calculations in permit pack.
7 | Contractor & Liability Essentials
Requirement | Why |
MTR‑licensed builder | Municipalities verify before issuing permit. |
2‑year workmanship warranty | Mandatory under Estonian law. |
All‑risk site insurance | Banks demand for loans > €50 k. |
Fixed‑price contract with staged payments | Guards against cost overruns. |
8 | Bryan Estates Permit Concierge
Architect + engineer bundle from €1 500.
Digital submission, progress tracking, and neighbour notices.
Preferred MTR‑licensed contractors vetted for quality.
Post‑works EPC verification & grant application support.
Frequently Asked Questions
Can I live in the flat during works?
Yes, but dust/noise—insurers advise temporary relocation if major structural changes.
What happens if I start without a permit?
Stop‑work order + fine up to €32 000; must still file permit retroactively.
Is English documentation accepted?
Plans can be bilingual, but official forms must be in Estonian.