Buying Properties in Estonia: Utility Connections & Infrastructure Guide
- John Philips

- Jul 23
- 2 min read
Updated: Nov 14

Why Sort Utilities Early?
Delays in power or water hookups can stall renovations, void mortgage conditions, and scare off tenants. Estonia’s digital portals let you activate most services in 48 hours—if you know where to click.
1 | Utility Providers at a Glance
Service | Main Operator(s) | Typical Setup Fee | Monthly Fixed Fee |
Electricity grid | Elektrilevi | €0–€250 (capacity dependent) | €2–€4 |
Natural gas | Eesti Gaas, Alexela | €40 meter install | €1.50 |
District heating | Utilitas (Tallinn), Fortum (Tartu/Pärnu) | Varies—often incl. in HOA | Meter rental €1 |
Water & sewer | Tallinna Vesi, Tartu Veevärk | €0–€200 connection | €6–€10 per m³ usage |
Fibre internet | Telia, Elisa, STV | €0–€50 promo | €20–€30 plan |
2 | Electricity: From Grid to Smart Meter
E-Land Register check – confirm meter point (EIC code).
Elektrilevi portal – sign network contract; choose capacity (main homes 1×32 A, apartments 3×16 A).
Pick a supplier – universal (NordPool spot) or fixed-rate plan.
Smart meter activation – automatic daily reads to e-Utility portal.
Time-of-use tariff can shave bills ≈ 18 %—ideal if you run a heat pump overnight.
3 | Water, Sewer & Storm Drainage
Urban plots: hook-ups completed within 7 days once permit cleared.
Rural: drill well (€2 500–€4 000) and install septic or bio-tank (€3 500–€6 000).
Meter photo needed each month unless you install LoRaWAN smart reader (€80).
4 | Heating Options & Costs
System | Install Capex | Typical kWh Cost* |
District (DH) | €0 if line at boundary | 9 c/kWh |
Air-to-water heat pump | €6 000–€10 000 | 7 c/kWh |
Pellet boiler | €4 000–€7 000 | 6 c/kWh + labour |
Direct electric | €1 000 (panels) | 18 c/kWh |
*2025 average tariffs; DH includes fixed component.
5 | Internet & Smart-Home Layer
Fibre availability map: riigikaart.ee → “Sidevõrk”.
Typical speeds: 500 Mb–1 Gb symmetrical.
Add Zigbee gateway + smart plugs (€25 each) for remote energy monitoring.
6 | Step-by-Step Connection Timeline (Typical Apartment)
Day | Task | Portal / Action |
0 | Notary signs deed | Get EIC, meter IDs |
1 | Electricity contract | |
1 | Water owner change | |
2 | Internet order | |
2 | District-heating form | |
3 | Smart-lock Wi-Fi online | – |
3 | All services live | 🎉 |
7 | Troubleshooting & Tips
Meter still in seller’s name? – Upload notarised deed; utilities update within 24 h.
Capacity upgrade needed? – Elektrilevi charges €156 per amp up to 63 A.
Frozen water line in winter? – Emergency heat trace cable €20/m.
High DH fixed fee? – Split between flats via HOA resolution; lobby for consumption-based billing.
Bryan Estates Utility Concierge
One form → we switch every service.
Bulk discounts on fibre & smart-home gear (save 10 %).
24/7 outage hotline in EN & EE.
Quarterly utility-efficiency report for investors.